Wood fence materials calculator
Estimate posts, sections, rails, pickets, and optional post caps for solid, shadowbox, stockade, spaced-picket, board-on-board, and rail fence scenarios.
About this calculator
The wood-fence takeoff counts posts from run length and spacing, then derives rails, pickets, and caps from the selected fence style and entered dimensions.
Steps
- Fence styleFence style (available in another mode)
Choose the option that matches your project.
- Fence lengthFence length (available in another mode)
Enter fence length in feet.
- Post spacingPost spacing (available in another mode)
Enter post spacing in feet.
- Rails per sectionRails per section (available in another mode)
Use a whole number.
- Picket actual widthPicket actual width (available in another mode)
Enter picket actual width in inches.
- Picket gap / overlapPicket gap / overlap (available in another mode)
Enter picket gap / overlap in inches.
- Post caps per postPost caps per post (available in another mode)
Enter post caps per post in caps per post.
Formula
posts = ceil(length ÷ post spacing) + 1; rails = sections × rails per section; pickets = ceil(length in inches ÷ (width + gap)); board-on-board = 1 + ceil(max(0, (length in inches − width) ÷ (width − overlap))), counting each board once
Notation: ceil rounds up to the next whole number; max selects the largest value.
Interpret the result
Counts follow the selected style and entered gaps or overlap. The output is not a structural design or a cut plan for stock lengths.
Worked example
For a 100-ft run at 8-ft post spacing, ceil(100 ÷ 8) + 1 = 14 posts. The rest of the takeoff uses the entered style, rail count, board width, and gap.
Example result: 14 posts
Example inputs
- Fence style
- Spaced picket
- Fence length
- 100 ft
- Post spacing
- 8 ft
- Rails per section
- 3 rails
- Picket actual width
- 5.5 in
- Picket gap / overlap
- 2 in
- Post caps per post
- 1 caps / post
FAQs
How are board-on-board pickets counted?
The entered actual width and overlap determine the count, with each physical board counted once.
Does this include a purchase allowance?
Only allowances shown in the inputs and formula are applied. If no waste, reserve, or package field is listed, the result does not infer one.
Does this make a complete construction or product plan?
No. It calculates the listed quantities from known inputs; it does not select structural dimensions, product compatibility, or code requirements.
