Deck support post cut length calculator

Deck / Layout

Calculate each support post cut length from known deck surface, framing stack and base elevations, then compare rough blanks with entered stock lengths.

Enter your inputs

A worked project example is loaded and calculated automatically. Replace the values with your project inputs.

1. Post locations and datum

Choose the option that matches your project.
Each line: post label, X (ft), Y (ft), base elevation (in). Separate columns with commas. Use one common elevation datum and up to 500 unique locations. X and Y must be nonnegative; base elevation may be negative.
in
Enter finished deck elevation at origin in inches.
%
Enter finished surface x slope as a percentage. See the formula for how it is applied.
%
Enter finished surface y slope as a percentage. See the formula for how it is applied.

2. Known framing stack

Choose the option that matches your project.
in
Enter actual decking thickness in inches.
in
Enter actual joist depth in inches.
in
Enter actual beam depth in inches.

3. Post top and base offsets

in
Enter known post-top offset from beam underside in inches.
in
Enter known base standoff below wood in inches.
in
Enter rough trimming allowance in inches.

4. Rough blanks and stock

Enter 1–16 available post stock lengths in feet, separated by commas or newlines. Each length must be greater than zero.

About this calculator

Post cuts combine known surface elevations, framing depth, beam arrangement, base elevations, offsets, and trimming allowance for each measured post location.

Steps

  1. Post locations input

    Choose the option that matches your project.

  2. Measured post rows

    Each line: post label, X (ft), Y (ft), base elevation (in). Separate columns with commas. Use one common elevation datum and up to 500 unique locations. X and Y must be nonnegative; base elevation may be negative.

  3. Grid X stations (available in another mode)

    Enter X stations in feet, separated by commas or newlines. Use nonnegative values in increasing order, up to 50 stations per axis and 500 grid locations in total.

  4. Grid Y stations (available in another mode)

    Enter Y stations in feet, separated by commas or newlines. Use nonnegative values in increasing order, up to 50 stations per axis and 500 grid locations in total.

  5. Finished deck elevation at origin

    Enter finished deck elevation at origin in inches.

  6. Finished surface X slope

    Enter finished surface x slope as a percentage. See the formula for how it is applied.

  7. Finished surface Y slope

    Enter finished surface y slope as a percentage. See the formula for how it is applied.

  8. Grid base elevation at origin (available in another mode)

    Enter grid base elevation at origin in inches.

  9. Grid base X slope (available in another mode)

    Enter grid base x slope as a percentage. See the formula for how it is applied.

  10. Grid base Y slope (available in another mode)

    Enter grid base y slope as a percentage. See the formula for how it is applied.

  11. Beam arrangement

    Choose the option that matches your project.

  12. Actual decking thickness

    Enter actual decking thickness in inches.

  13. Actual joist depth

    Enter actual joist depth in inches.

  14. Actual beam depth

    Enter actual beam depth in inches.

  15. Known post-top offset from beam underside

    Enter known post-top offset from beam underside in inches.

  16. Known base standoff below wood

    Enter known base standoff below wood in inches.

  17. Rough trimming allowance

    Enter rough trimming allowance in inches.

  18. Available post stock lengths

    Enter 1–16 available post stock lengths in feet, separated by commas or newlines. Each length must be greater than zero.

Formula

Finished surface = entered datum elevation + 12 × X × X slope ÷ 100 + 12 × Y × Y slope ÷ 100. Dropped beam underside = surface − decking thickness − joist depth − beam depth; flush beam underside = surface − decking thickness − beam depth. Post top = beam underside + known signed top offset. Wood bottom = base elevation + known standoff. Cut length = post top − wood bottom; rough blank = cut length + entered trim allowance. Each post selects the shortest entered stock that fits its rough blank. No structural size, notch, footing or connection is selected.

Interpret the result

The schedule compares each rough blank with stock lengths you enter. It does not select beam or post sizes, connections, footings, or structural elevations.

Worked example

For the dropped-beam example, the underside is 48 − 1 − 9.25 − 7.25 = 30.5 in. P1 has a 0-in base elevation and 1-in standoff, so its cut is 29.5 in and rough blank is 29.625 in. The remaining three rows also fit the entered 4-ft stock; 4 locations produce 4 blanks.

Example result: 4 posts; 4 stock blanks

Example inputs
Post locations input
Measured post rows
Measured post rows
P1,0,0,0 P2,10,0,-6 P3,0,10,-3 P4,10,10,-9
Finished deck elevation at origin
48 in
Finished surface X slope
0 %
Finished surface Y slope
0 %
Beam arrangement
Dropped beam below joists
Actual decking thickness
1 in
Actual joist depth
9.25 in
Actual beam depth
7.25 in
Known post-top offset from beam underside
0 in
Known base standoff below wood
1 in
Rough trimming allowance
0.125 in
Available post stock lengths
4,6,8

FAQs

What is the rough blank?

It is the calculated cut length plus the trimming allowance entered for stock comparison.

What do the layout marks refer to?

Use the stated origin, centerline or face reference, and units shown with the result. Display rounding may differ from the internal coordinates.

Does this approve the selected dimensions or product?

No. It lays out the dimensions you enter and does not establish structural capacity, product cutting permission, or installation compliance.