Deck support post cut length calculator
Calculate each support post cut length from known deck surface, framing stack and base elevations, then compare rough blanks with entered stock lengths.
About this calculator
Post cuts combine known surface elevations, framing depth, beam arrangement, base elevations, offsets, and trimming allowance for each measured post location.
Steps
- Post locations inputPost locations input (available in another mode)
Choose the option that matches your project.
- Measured post rowsMeasured post rows (available in another mode)
Each line: post label, X (ft), Y (ft), base elevation (in). Separate columns with commas. Use one common elevation datum and up to 500 unique locations. X and Y must be nonnegative; base elevation may be negative.
- Grid X stationsGrid X stations (available in another mode)
Enter X stations in feet, separated by commas or newlines. Use nonnegative values in increasing order, up to 50 stations per axis and 500 grid locations in total.
- Grid Y stationsGrid Y stations (available in another mode)
Enter Y stations in feet, separated by commas or newlines. Use nonnegative values in increasing order, up to 50 stations per axis and 500 grid locations in total.
- Finished deck elevation at originFinished deck elevation at origin (available in another mode)
Enter finished deck elevation at origin in inches.
- Finished surface X slopeFinished surface X slope (available in another mode)
Enter finished surface x slope as a percentage. See the formula for how it is applied.
- Finished surface Y slopeFinished surface Y slope (available in another mode)
Enter finished surface y slope as a percentage. See the formula for how it is applied.
- Grid base elevation at originGrid base elevation at origin (available in another mode)
Enter grid base elevation at origin in inches.
- Grid base X slopeGrid base X slope (available in another mode)
Enter grid base x slope as a percentage. See the formula for how it is applied.
- Grid base Y slopeGrid base Y slope (available in another mode)
Enter grid base y slope as a percentage. See the formula for how it is applied.
- Beam arrangementBeam arrangement (available in another mode)
Choose the option that matches your project.
- Actual decking thicknessActual decking thickness (available in another mode)
Enter actual decking thickness in inches.
- Actual joist depthActual joist depth (available in another mode)
Enter actual joist depth in inches.
- Actual beam depthActual beam depth (available in another mode)
Enter actual beam depth in inches.
- Known post-top offset from beam undersideKnown post-top offset from beam underside (available in another mode)
Enter known post-top offset from beam underside in inches.
- Known base standoff below woodKnown base standoff below wood (available in another mode)
Enter known base standoff below wood in inches.
- Rough trimming allowanceRough trimming allowance (available in another mode)
Enter rough trimming allowance in inches.
- Available post stock lengthsAvailable post stock lengths (available in another mode)
Enter 1–16 available post stock lengths in feet, separated by commas or newlines. Each length must be greater than zero.
Formula
Finished surface = entered datum elevation + 12 × X × X slope ÷ 100 + 12 × Y × Y slope ÷ 100. Dropped beam underside = surface − decking thickness − joist depth − beam depth; flush beam underside = surface − decking thickness − beam depth. Post top = beam underside + known signed top offset. Wood bottom = base elevation + known standoff. Cut length = post top − wood bottom; rough blank = cut length + entered trim allowance. Each post selects the shortest entered stock that fits its rough blank. No structural size, notch, footing or connection is selected.
Interpret the result
The schedule compares each rough blank with stock lengths you enter. It does not select beam or post sizes, connections, footings, or structural elevations.
Worked example
For the dropped-beam example, the underside is 48 − 1 − 9.25 − 7.25 = 30.5 in. P1 has a 0-in base elevation and 1-in standoff, so its cut is 29.5 in and rough blank is 29.625 in. The remaining three rows also fit the entered 4-ft stock; 4 locations produce 4 blanks.
Example result: 4 posts; 4 stock blanks
Example inputs
- Post locations input
- Measured post rows
- Measured post rows
- P1,0,0,0 P2,10,0,-6 P3,0,10,-3 P4,10,10,-9
- Finished deck elevation at origin
- 48 in
- Finished surface X slope
- 0 %
- Finished surface Y slope
- 0 %
- Beam arrangement
- Dropped beam below joists
- Actual decking thickness
- 1 in
- Actual joist depth
- 9.25 in
- Actual beam depth
- 7.25 in
- Known post-top offset from beam underside
- 0 in
- Known base standoff below wood
- 1 in
- Rough trimming allowance
- 0.125 in
- Available post stock lengths
- 4,6,8
FAQs
What is the rough blank?
It is the calculated cut length plus the trimming allowance entered for stock comparison.
What do the layout marks refer to?
Use the stated origin, centerline or face reference, and units shown with the result. Display rounding may differ from the internal coordinates.
Does this approve the selected dimensions or product?
No. It lays out the dimensions you enter and does not establish structural capacity, product cutting permission, or installation compliance.