Chain-Link fence material calculator

Fence / Quantity

Count chain-link fabric, posts, top rail, wire, fittings, specified gate hardware and concrete for a straight level run split by known gates.

Enter your inputs

A worked project example is loaded and calculated automatically. Replace the values with your project inputs.

Input notes

For one straight, level fence line with a gate between each pair of fence stretches. Enter each fence stretch from terminal-post center to terminal-post center. Gate openings are clear face-to-face widths, not leaf widths. With one stretch enter “none” for gate rows. Corners, shared terminals, branches and slopes are excluded. The examples are arithmetic inputs, not selected safe sizes or universal product schedules.

Gate rows: single/double, clear opening ft, additional hinge pairs, latch kits, drop rods. Select matching assembled gate kits yourself; each row counts one kit. Enter only hardware needed in addition to what the kit already contains. One hinge pair means one male plus one female hinge, with two separately counted bolts in this declared recipe. Double-gate latches and rods are explicit product inputs.

Clear fabric span deducts actual terminal half-diameters, then the entered fabric end-fitting deductions. Pooled rolls assume compatible-height material and permitted splicing/offcut reuse. Rail purchase is separate per stretch: joint overlap, end insertion and cut kerf are explicit. A nearly full final cut may require equal cut pieces from an extra rail. Selected product cutting/joint permissions remain your responsibility. Tie schedules include both endpoints of each line or rail/wire run; repeated material locations do not mean one shared tie.

1. Center spans, gates and actual post sizes

Enter 1–20 positive distances between terminal-post centers in feet, separated by commas or newlines.
Each line: single or double, clear opening (ft), additional hinge pairs, latch kits, drop rods. Separate columns with commas. Enter one fewer gate row than fence stretches; enter none for no gates.
ft
Enter fabric height in feet.
ft
Enter maximum post centers in feet.
in
Enter actual line post diameter in inches.
in
Enter actual ordinary end post diameter in inches.
in
Enter actual gate post diameter in inches.

2. Fabric and roll allowances

ft
Enter fabric roll length in feet.
%
Enter fabric allowance as a percentage. See the formula for how it is applied.
in
Enter fabric end fitting deduction per end in inches.
Choose the option that matches your project.

3. Top rail and cut allowances

Choose the option that matches your project.
ft
Enter rail stock length in feet.
in
Enter joint overlap per rail connection in inches.
in
Enter rail end insertion allowance per end in inches.
in
Enter rail cut kerf in inches.
each
Use a whole number.
in
Enter maximum rail tie spacing in inches.

4. Wire and attachment schedules

lines
Use a whole number.
ft
Enter wire roll length in feet.
in
Enter wire end allowance per termination in inches.
in
Enter maximum wire tie spacing in inches.
each
Use a whole number.
each
Use a whole number.

5. Tension bands and vertical ties

each
Use a whole number.
in
Enter maximum vertical line-post tie spacing in inches.

6. Known footings and labeled bag yield

Each line: post role (line, end, or gate), hole diameter, hole depth, effective displaced diameter, embedded displacement depth. All dimensions are in inches. Separate columns with commas and include every post role used.
cu ft
Use the yield printed on the selected product and bag size, in cubic feet per bag.
%
Enter concrete allowance as a percentage. See the formula for how it is applied.
Choose the option that matches your project.

7. Component purchase packs

Each line: component key, units per pack. Separate columns with commas; use positive whole pack sizes. Copy keys exactly, such as ties, bandBolts, or tensionBars. Enter none to buy individual units.

About this calculator

This takeoff treats each straight fence stretch between terminal-post centers separately, then combines the entered gate, fabric, rail, wire, hardware, pack, and footing schedules.

Steps

  1. Fence stretches between terminal centers

    Enter 1–20 positive distances between terminal-post centers in feet, separated by commas or newlines.

  2. Gate rows between adjacent stretches

    Each line: single or double, clear opening (ft), additional hinge pairs, latch kits, drop rods. Separate columns with commas. Enter one fewer gate row than fence stretches; enter none for no gates.

  3. Fabric height

    Enter fabric height in feet.

  4. Maximum post centers

    Enter maximum post centers in feet.

  5. Actual line post diameter

    Enter actual line post diameter in inches.

  6. Actual ordinary end post diameter

    Enter actual ordinary end post diameter in inches.

  7. Actual gate post diameter

    Enter actual gate post diameter in inches.

  8. Fabric roll length

    Enter fabric roll length in feet.

  9. Fabric allowance

    Enter fabric allowance as a percentage. See the formula for how it is applied.

  10. Fabric end fitting deduction per end

    Enter fabric end fitting deduction per end in inches.

  11. Fabric roll rounding

    Choose the option that matches your project.

  12. Top rail

    Choose the option that matches your project.

  13. Rail stock length

    Enter rail stock length in feet.

  14. Joint overlap per rail connection

    Enter joint overlap per rail connection in inches.

  15. Rail end insertion allowance per end

    Enter rail end insertion allowance per end in inches.

  16. Rail cut kerf

    Enter rail cut kerf in inches.

  17. Separate couplers per rail joint

    Use a whole number.

  18. Maximum rail tie spacing

    Enter maximum rail tie spacing in inches.

  19. Specified wire lines

    Use a whole number.

  20. Wire roll length

    Enter wire roll length in feet.

  21. Wire end allowance per termination

    Enter wire end allowance per termination in inches.

  22. Maximum wire tie spacing

    Enter maximum wire tie spacing in inches.

  23. Brace bands per wire termination

    Use a whole number.

  24. Tensioners per wire termination

    Use a whole number.

  25. Tension bands per tension bar

    Use a whole number.

  26. Maximum vertical line-post tie spacing

    Enter maximum vertical line-post tie spacing in inches.

  27. Known footing and displacement schedule

    Each line: post role (line, end, or gate), hole diameter, hole depth, effective displaced diameter, embedded displacement depth. All dimensions are in inches. Separate columns with commas and include every post role used.

  28. Yield per concrete bag

    Use the yield printed on the selected product and bag size, in cubic feet per bag.

  29. Concrete allowance

    Enter concrete allowance as a percentage. See the formula for how it is applied.

  30. Concrete bag rounding

    Choose the option that matches your project.

  31. Component pack sizes

    Each line: component key, units per pack. Separate columns with commas; use positive whole pack sizes. Copy keys exactly, such as ties, bandBolts, or tensionBars. Enter none to buy individual units.

Formula

For each terminal-center span s, intervals = ceil(s ÷ entered maximum centers), line posts = intervals − 1. With M separate stretches, terminal posts = 2M; gate posts = 2(M−1), ordinary end posts = 2. Clear span deducts the two terminal half-diameters; fabric additionally deducts the entered end fittings. Rails include explicit end allowances, joint overlap and cut kerf. Wire, ties, bands, gate hardware and packs follow the entered schedules. Concrete uses separate known circular hole/displacement geometry per post role and entered bag yield. No structural or product sizing is selected.

Notation: ceil rounds up to the next whole number.

Interpret the result

The headline summarizes selected quantities, while the result details break them into components. Gate kits and terminal posts follow the entered stretch and gate rows; concrete depends on the entered hole geometry and bag yield.

Worked example

Each 48-ft stretch with a 10-ft maximum center spacing needs ceil(48 ÷ 10) = 5 intervals, or 4 line posts. Two stretches therefore use 8 line posts; the entered end and gate positions add 4 posts, giving 12. The matching 4-ft fabric stretches total just under 96 ft, which rounds to 2 rolls of 50 ft.

Example result: 12 posts; 2 fabric rolls

Example inputs
Fence stretches between terminal centers
48,48
Gate rows between adjacent stretches
single,4,2,1,0
Fabric height
4 ft
Maximum post centers
10 ft
Actual line post diameter
1.625 in
Actual ordinary end post diameter
2.375 in
Actual gate post diameter
3 in
Fabric roll length
50 ft
Fabric allowance
0 %
Fabric end fitting deduction per end
0 in
Fabric roll rounding
Pool compatible lengths and reuse/splice fabric
Top rail
Include specified top rail
Rail stock length
10 ft
Joint overlap per rail connection
2 in
Rail end insertion allowance per end
0 in
Rail cut kerf
0.0625 in
Separate couplers per rail joint
0 each
Maximum rail tie spacing
24 in
Specified wire lines
1 lines
Wire roll length
100 ft
Wire end allowance per termination
6 in
Maximum wire tie spacing
24 in
Brace bands per wire termination
1 each
Tensioners per wire termination
1 each
Tension bands per tension bar
4 each
Maximum vertical line-post tie spacing
24 in
Known footing and displacement schedule
line,10,24,1.625,24 end,12,30,2.375,30 gate,12,30,3,30
Yield per concrete bag
0.6 cu ft
Concrete allowance
0 %
Concrete bag rounding
Pool the concrete volume
Component pack sizes
ties,100 bandBolts,100

FAQs

Where do I measure each fence stretch?

Enter each stretch from terminal-post center to terminal-post center. Gate openings are entered separately as clear face-to-face widths.

Does this include a purchase allowance?

Only allowances shown in the inputs and formula are applied. If no waste, reserve, or package field is listed, the result does not infer one.

Does this make a complete construction or product plan?

No. It calculates the listed quantities from known inputs; it does not select structural dimensions, product compatibility, or code requirements.

Additional examples and limits

Length conventions and component limits

Two separate 48-ft terminal-center spans with entered 10-ft maximum centers need four line posts each: 8 line posts, plus 4 distinct terminal/gate posts, for 12 posts total. The two inside terminal posts support one gate and are counted once each. With 2.375-in end posts and 3-in gate posts, each fabric clear span is 48 − (2.375 + 3) ÷ 24 = 47.776042 ft before extra end-fitting deductions. A 4-ft clear gate opening gives 100.447917 ft between the outer faces of the two ordinary end posts.

This page uses entered dimensions and schedules, including explicit latch/drop-rod counts for double gates. Band bolts follow the entered bands per termination; hinge bolts follow one male and one female bolt per entered pair. Bracing beyond the listed components is not inferred.

Concrete rows use known hole and effective post-displacement geometry separately for line, end and gate posts. An open tube is not automatically a solid cylinder: enter an effective displaced diameter based on your plan, or zero for no displacement deduction. Use the yield shown on the bag being purchased. Pooled-volume and per-hole whole-bag rounding are different purchase policies; neither selects a foundation design.

Use at most 20 stretches, 1,000 total posts and 10,000 rail pieces. Overlapping post faces, consumed spans, missing role schedules, invalid gate counts, impossible overlap/kerf and invalid packaging are rejected. Net fabric area is height × measured fabric length; assembled gates are separate kits, not extra loose fabric. Rail offcuts are not shared across stretches. Footing depths, product sizes, wind/soil loads, gate structure, anti-sag bracing, permits, pool rules and installed cost are not selected or approved.